Swajal Progress

Total no. of villages taken up.

Batch -1 Batch-2 Batch-3 Batch-3X/GP Batch-4 Total
10 23 58 84+10 172 357

Batch wise village status

Sl.No Name of the District Number of Villages
Batch-1 Batch-2 Batch-3 Batch-3x Batch-4 Total
1. Jhansi 5 5 19 13 20 62
2. Jalaun 0 3 11 31 55 100
3. Mahoba 2 0 6 6 28 42
4. Lalitpur 1 6 3 29 9 48
5. Chitrakoot 0 6 10 1 35 52
6. Banda 1 0 2 5 11 19
7. Hamirpur 0 3 7 9 14 33
8. Deoria 1 0 0 0 0 1
Total 10 23  58 94 172 357

District wise village status

S.No District Total No of Villages Planning Phase Implementation Phase Work Completed
1 Jhansi 58 0 0 58
2 Jalaun 100 0 0 100
3 Lalitpur 52 0 0 52
4 Mahoba 42 0 0 42
5 Chitrakoot 56 0 0 56
6 Banda 15 0 0 15
7 Hamirpur 33 0 0 33
8 Deoria 1 0 0 1
Total 357 0 0 357

District wise hand pump scheme

Sl. No. District Total No of Villages Villages having Hand Pump Scheme Completed villages having Hand Pump Scheme Total Target of Hand Pump Total Installed Hand Pump % of Installed Hand Pump
1 Jhansi 58 42 42 607 550 90.61
2 Jalaun 100 91 91 934 926 99.14
3 Lalitpur 52 47 47 448 366 81.70
4 Mahoba 42 41 41 326 296 90.80
5 Chitrakoot 56 49 49 568 550 96.83
6 Banda 15 17 17 109 81 74.31
7 Hamirpur 33 28 28 213 212 99.53
8 Deoria 1 1 1 31 25 80.65
Total 357 316 316 3236 3006 92.89

District wise status of piped water supply scheme

Sl.No. District Total No of Villages Villages having Piped Water Supply Scheme Completed villages having Piped WaterSupply Scheme Physical Progress
1 Jhansi 58 16 16 100.00
2 Jalaun 100 9 9 100.00
3 Lalitpur 52 5 5 100.00
4 Mahoba 42 1 1 100.00
5 Chitrakoot 56 3 3 100.00
6 Banda 15 2 2 100.00
7 Hamirpur 33 5 5 100.00
8 Deoria 1 0 0 -
Total 357 41 41 100.00

Works completed

Beginning Year Villages taken up Target time for completion Work Status(No.  of villages) Number of Support Organizations engaged
PP IP O & M
Batch-1 Sep., 1996 10 Feb., 1999 0 0 10 5
Batch-2 Oct., 1997 23 March, 2000 0 0 23 6
Batch-3 Oct., 1998 58 March, 2001 0 0 58 12
Batch-3X Oct., 1999 84 March, 2002 0 0 84 8
Batch-4 Oct., 1999 172 March, 2002 0 0 172 19
PRI Oct., 2000 10 March, 2002 0 0 10 -
Total - 357 - 0 0 357 50

Exit status as on 30th september, 2003

Batch 1 Batch 2 Batch 3 Batch 3 X Batch 4 PRI Total
No. ofVillages Exit nos. No. of Villages Exit nos. No. of Villages Exit nos. No. of Villages Exit nos. No. of Villages Exit nos. No. of Villages Exit nos.  Exit
Jhansi 6 6 14 14 34 34 65 65 84 84 8 8 211
Banda 3 3 9 9 25 25 19 19 88 88 2 2 145
Lucknow 1 1 - - - - - - - - - - 1
Total 10 10 23 23 59 59 84 84 172 172 10 10 357

Financial status of the project (as on 30th september, 2003)(rs. in crores)

Sr.No Subject  
  Original Cost (Uttaranchal and Uttar Pradesh) 300.00
  Revised Cost (Uttar Pradesh Only) 134.16
  Reimbursable Cost (Uttar Pradesh Only) 113.26
  Funds released during current financialyear (2003-2004) NIL
  Funds released during entire period 131.45
  Expenditure in the financial year 2003-2004 4.00
  Actual expenditure since beginning 130.83
  Reimbursable against actual expenditure 109.02
  Reimbursement claims submitted 109.02
  ACA Received 106.38
  Pending Reimbursement claims 2.64

Regional studies

Regional scheme:

RWSC (Regional Water Supply & Sanitation Committees) and VWSC (Village Water Supply and Sanitation Committees) have been constituted and notified as per provisions of Panchayat Raj Act. The State Govt. has committed to complete the unfinished works out of its own resources. The CAPs for the two schemes have been prepared. Agreements for the two MVWS have been entered. Details of the two MVWS are as below: -

  • Mohammadabad-Chilli MVWS:Five villages namely Mohammadabad, Chilli, Aeri, Rampura and Kusumiliya are included in the project. Water supply exists at present in these villages but needs augmentation and reorganisation. Total present population is 11227 and the system is now designed for 16724 at the per capital supply of 70 lpcd.Cost of water supply works – 65 lakhs, Community contribution collected against capital cost – Rs.4.664 lakhs (7.18%).Unskilled labour component in project – 8.63% of capital cost.Two tubewells already exist, works proposed are construction of village OH Tanks i.e. 155 KL at 20 meter staging at Mohammadabad, 45 KL at 11 meter staging for Aeri and Rampura village, 140 KL at 13 meter staging at Kusumiliya and 60 KL at 13 meter staging at Chilli. Feeder mains from the central OH Tank at Mohammadabad will be laid to the respective village OH Tanks where from the water will be distributed through distribution mains proposed inside the village.The agreement is entered between five parties namely SO (T) - Jhansi Division Jal Sansthan, SO (C) – Bharat Gramodhyog Vikas Samiti, Orai, RWSCfive VWSCs and PMU.
  • Parasan-Imiliya MVWS:Three villages namely Parasan, Imiliya and Dassheri are included in the scheme. At present there is no pipe water supply system in these villages and people meet their water demand through handpumps and open dugwells. The total present population of all the three villages is 7915 and the system is designed for a population of 11007.Cost of water supply works Rs.60.10. Community contribution against capital cost Rs.3,92,000 (6.52%)Works proposed are construction of 1000 lpm capacity tubwell and 70 KL capacity central OH Tank at the water works site. From the central overhand tank the water will be carried to the village OH tanks at Dassheri, Imiliya and Parasan of capacities 30 KL, 60 KL and 120 KL respectively. The water will be supplied inside the village through a network of distribution system for each village fed form the respective OH tanks.

The agreement entered is between four parties namely SO-Paramarth Seva Sansthan, Orai which will assist in technical as well as community works, RWSC, three VWSCs and PMU.